Production scheduling
in seconds, not hours.

Scheduling that adapts in real time - change something, get a new plan instantly.

<30s
Schedule generation time
6+
Months forward capacity view
Real-time
Integration with ERP
100%
Self-hosted & data-sovereign

Manual scheduling doesn’t scale.

Every plant manager knows the drill — spreadsheets, whiteboards, and constant firefighting. It costs more than you think.

Hours lost to replanning

Every machine breakdown or rush order means rebuilding the schedule from scratch. Planners spend more time firefighting than planning.

Invisible bottlenecks

Without real-time capacity analysis, overloaded machines and material shortages only surface when it’s already too late.

No confidence in commitments

Accepting a new order? You’re guessing whether you can deliver on time — because you can’t simulate the impact beforehand.

Everything you need.
Nothing you don’t.

Four core capabilities that replace spreadsheets, guesswork, and late-night replanning sessions.

Automated Scheduling

Define constraints.
Get an optimised plan.

Set up your machines, operations, shift patterns, and maintenance windows. Our scheduler handles sequencing, machine assignment, and timing automatically.

  • Priority-based scheduling with deadline awareness
  • Automatic batch splitting across shift windows
  • Setup transition matrices built in
Automated scheduling interface
Interactive Gantt Chart

See your entire floor.
Adjust with a drag.

Visualise your complete production timeline. Drag entries to manually adjust — the system respects your overrides and recalculates around them.

  • Full production floor on a single timeline
  • Drag-and-drop manual overrides
  • Real-time conflict detection
Interactive Gantt chart
What-if Simulation

Know the answer
before you commit.

Before accepting a new order, simulate its impact on the existing schedule. Understand delivery feasibility, resource conflicts, and timeline changes — instantly.

  • Simulate new orders against live schedules
  • Instant impact analysis on delivery dates
  • Confident customer commitments, every time
What-if simulation interface
Capacity Analysis

Spot bottlenecks
6 months in advance.

Identify overloaded machines and constrained periods broken down by operation type. Proactive planning, not reactive firefighting.

  • Machine-level utilisation breakdown
  • Operation-type heatmaps
  • 6 months forward visibility
Capacity analysis dashboard

Production-ready from day one.

Not a generic tool adapted for manufacturing. Purpose-built for how factories actually operate.

Maintenance windows

Block machines during planned downtime. The solver schedules around your maintenance — not through it.

Setup transitions

Transition matrices account for changeover time between products. Because switching from A to B isn’t instant.

Batch splitting

Large orders automatically split into batches that fit within shift windows. No manual intervention required.

Priority & deadlines

Priority-based scheduling with full deadline awareness. Critical orders are protected automatically.

Real-time KPIs

Machine utilisation, orders at risk, and inventory alerts — all on a live dashboard.

Your data stays yours.

Self-hosted, SSO-ready, and built to integrate with what you already run.

Self-hosted deployment

Runs on your infrastructure. No data leaves your network. Full sovereignty over your production data.

Keycloak SSO

Integrate with your existing identity provider via Keycloak. Single sign-on for all users.

Multi-tenant

One platform, multiple factory sites. Centralised management with site-level separation.

REST API integration

Connect to your existing ERP and MES systems. Full API access for bi-directional data flow.

See it work with your production data.

No generic demo. We’ll set up the platform with your machines, your products, and your constraints — so you can evaluate it against your real-world scheduling challenges.

  • Personalised demo with your production data
  • 30-minute session with a scheduling specialist
  • No obligation, no sales pressure
  • Available for on-site or remote sessions

Get started